COSHH
Control Of Substances Hazardous To Heath (Regulations 2002) require employers to assess the risks from hazardous substances and take appropriate precautions.
There is a huge amount of information available on the Internet regarding COSHH Assessments. Carrying out a Coshh assessment can be a daunting task. We know that our suppliers material safety data sheets can be confusing and sometimes the information we need is just not available in one place.
How can we help?
We have compiled a 42 Page COSHH Template and Guide Pack that will help you through the minefield of information you end up gathering. Our COSHH Assessment Pack also contains worked examples from Material Safety Data Sheets through to the completed assessments as well as useful chemical and PPE symbols to add to your assessments, All this for a Special Price of £15.00!.
Our Coshh Assessment Pack also includes the lists of risk and safety phrase numbers and meanings which are derived from the CHIP Regulations - Chemicals (Hazard Information and Packaging for Supply). They are found in Material Safety Data Sheets to identify potential hazards and offer safe handling advice in terms of personal protective equipment requirements.
COSHH Risk Assessment Guide the 8 steps you must take:-
1. Assess the risks:-
- Here you must use all possible information available to assess the use of hazardous substances and substances created from your activities.
- The starting point is the MSDS or material safety data sheet; this is the product substance information that has been compiled by or for the manufacturers of the particular product.
- The material or product safety data sheet should contain the chemical/substance ingredients and percentage of the overall product, Risk and Safety Phrases, and on occasion CAS (American Chemical Society classification number). The sheets should include exposure limits, first aid and fire fighting information, as well as the important spillage and disposal information and PPE requirements.
Assessing the risks from substances will involve you making a decision that would be affecting someone's health. The following items should be considered:-
- How much of the chemical/substance would be used and or produced by the work, and how would people be exposed to it (inhalation/skin contact for example).
- Just who could be exposed to these and the duration that they could be exposed. It's well worth considering not only workers, but importantly young and inexperienced persons as well as pregnant woman. For example, Risk Phrases for pregnant women should be noted on any material safety data sheet that contains chemicals/substances that can cause unborn children health problems. The Risk Phrases for pregnant women are R61 to R63.
- As you have already determined, anyone doing an assessment must have knowledge of the hazards and the risks involved. They should also understand how the work activities will use or produce these, be able to use experience to make the correct decisions concerning these risks, and know the precautions involved in these processes.
2. Decide what precautions to take:-
- When the initial assessment has been carried out, or if significant risks are identified prior to any assessment, then action is required to reduce or remove the risks to an acceptable level. This can be done by finding a substitute chemical/substance that is far less hazardous or by following guidance as set out in the next 6 steps.
3. Prevent or control exposure:-
- Prevention to exposure must be considered and if it's practicable, then consider changing the process/s so that the hazardous chemical or substance is either not required or that the generation of any hazardous chemical/substance is no longer generated.
- Check to see if the chemical/substance can be substituted or used in a different form, for example, the use of pellets instead of a powder.
If prevention to exposure or substitution is not practicable, then the exposure rates MUST be controlled. The following measures should be used:-
- Use work processes, systems and engineering controls that will minimize the materials that are used/produced and use equipment that can totally enclose the process.
- Control exposure at its source (e.g. exhaust ventilation), reduce the duration of the exposure and reduce the quantities of the hazardous chemical/substance.
- Provide personal protective equipment (PPE). This should be seen as a last resort and should never be used in place of any control measures that have been set up. Therefore PPE should only be used as PART of your controls.
4. Set up exposure control measures and ensure that they are followed:-
COSHH requires that employees make proper use of control measures and that any defects are reported without delay.
Therefore staff should be given adequate training to ensure that they understand the control measures. Suitable supervision must be available when these measures are being carried out.
The control measures MUST be maintained to ensure that each significant element of the measures works as it was originally intended to work. For example, if respiratory equipment was to be used, then this equipment must be checked at regular intervals.
5. Monitor Exposure:-
Under COSHH you must measure the concentration of hazardous substances in the air breathed in by your workers where your assessment concludes that:-
- There could be serious risks to health if control measures failed.
- The exposure limits could be exceeded.
- Control measures are not working.
However you do not need to do this if you can show by evaluation that you are preventing or controlling exposure by a system that sounds an alarm if hazardous substances are detected. The COSHH ACOP provides examples of other alternatives of evaluation.
Air monitoring must be carried out when employees are exposed to substances and processes specified under schedule 5 of the COSHH regulations.
Monitoring records should be kept for 5 years. If health surveillance is carried out, then monitoring reports are to be kept with medical surveillance records.
6. Carry out appropriate health surveillance:-
COSHH requires that health surveillance be conducted in these circumstances:-
- Where an employee is exposed to a substance listed in Schedule 6 of COSHH (see below)
- Where employees are exposed to a substance linked to a particular disease or adverse health effect and there is a reasonable likelihood, under the conditions of the work, of that disease or effect occurring, and it's possible to detect the disease or health effect.
Health surveillance may involve examination by a doctor or trained nurse. In some cases trained supervisors could check the employee's skin for dermatitis or ask questions about breathing difficulties.
7. Prepare plans and procedures to deal with accidents, incidents and emergencies:-
Where the work activity gives rise to the risk of an accident, incident or emergency involving expose to a hazardous substance which goes well beyond the normal day to day work.
In these circumstances, your response must be planned before any emergency involving hazardous substances.
Setting up a procedure where warning and communication systems are in place to enable an appropriate response immediately after any incident occurs, and to ensure that information on emergency arrangements is available to those who need to see it. This includes the emergency services, and these procedures need to be practiced at regular intervals.
If any accident/incident occurs, you must ensure that immediate steps are carried out to minimize the harmful effects and restore the situation to normal.
Only trained staff are to remain in any emergency area and only if they have been issued with the appropriate safety equipment.
8. Ensure employees are trained, informed & supervised.
COSHH requires that employees are provided with suitable information, instruction and training, which could include:-
- Names of substances they work with or could be exposed to and access to the Material Safety Data Sheets.
- The findings of a risk assessment.
- Training on how they can protect themselves (and others).
- How to check and use any Personal Protective Equipment that has been issued to them.
- The results of any exposure monitoring and or health surveillance without divulgence of employee names. (They are allowed access to their own records).
- Emergency procedures that must be followed.
The training, information and instruction should be updated and adapted to any changes in the type of work or the methods of work. When this is done, the information must be passed on to the staff and understood by all employees.
The previous 8 requirements are critical. Your employees MUST understand the risks involved and fully understand the steps and control measures to be taken to reduce these risks.